Installation of this catalytic converter is straightforward, as it is designed to fit seamlessly with the original exhaust system of the vehicle. It is a direct replacement for the factory catalytic converter, ensuring a perfect fit and easy installation without the need for any modifications.
The Euro3 Euro4 Stainless Steel Catalytic Converter is an excellent choice for Mercedes-Benz owners who are looking to upgrade their exhaust system with a durable, high-performance catalytic converter that meets strict emissions standards. With its easy installation and long-lasting durability, this product is sure to provide reliable performance for years to come.
Carfitment | ||||
OE NO. | Car Fitment: | Mold | Year: | |
A2204904519 A2204904619 | Mercedes CL500 | 5.0i WDB215375 | 09/1999-9/2006 | |
Mercedes S430 | 4.3i WDB220070 | 01/1999-01/2006 | ||
Mercedes S430 | 4.3i WDB220170 | 01/1999-01/2006 | ||
Mercedes S500 | 5.0i WDB220075 | 01/1999-01/2006 | ||
Mercedes S500 | 5.0i WDB220175 | 01/1999-01/2006 | ||
Mercedes S500 | 5.0i WDB220875 | 01/1999-01/2006 | ||
Product name | CATALYTIC CONVERTER FOR Mercedes CL500 5.0i WDB215375 01/1999-01/2006 ALZ LEFT EXHAUST PIPE | |||
Model Number | DJN171-176 | |||
Brand Name | DJN | |||
Emission Standard: | EURO 2/3/4/5 | |||
Material | Inside : ceramic(honeycomb) substrate 400cpsi with mat | |||
Shell :304 or 409 # stainless steel shell,stainless steel pipe | ||||
Oxygen sensor ports | Yes | |||
cpsi | 400 /600/800 | |||
Wall thickness | 0.09±0.025 | |||
Warranty | 30000 miles performance/2 years | |||
Packaging: | Air bubble film and Carton Packing | |||
MOQ: | 50 pcs | |||
Supply Ability | 1000 Piece/Pieces per Week | |||
Place of Origin: | Jiangsu | |||
SAMPLE ORDER: | Accept | |||
Condition | new | |||
Function | reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency; | |||
Service | Customers' specific demands available, design drawings are welcomed. OEM service is accepted | |||
Supply Ability | 1000 Piece/Pieces per Month | |||
Packaging & delivery | Air bubble film and Carton Packing, inside fix the product decently with expanded material | |||
Port | Shanghai/Ningbo | |||
Lead time: | 10-30 days . | |||
Active catalyst ingredients | Pt, Pd, Rh, and rare earth elements | |||
Shape | round, oval, race track |